Home/Platform/Release calendar & freeze
Pillar 5 of 6

One timeline, freezes that enforce themselves

A release calendar in Confluence is a document. ArcRelease makes it a control: freeze windows enforce themselves at deploy time, and two teams heading for the same service in the same week find out at planning rather than at merge.

In short

What is an enforced freeze window?

An enforced freeze window is a change-freeze that the deploy path actually respects. ArcRelease builds the calendar from your Jira fix versions, adds freezes owned by a named team, and flags a release that would ship inside one before it goes out.

The problem

Where the calendar fails today.

“

The freeze was in a Confluence page nobody deploying at 22:00 had open.

“

Two teams booked the same service in the same window and only found out at merge.

“

Finance owns the quarter-end freeze, but engineering is the one who breaks it.

Release calendar & freeze

The calendar becomes a control.

A calendar you have to remember to check is not a control. ArcRelease turns the timeline into something the release process enforces on its own.

Zero
surprise freeze violations, when the calendar enforces itself
Freeze windows are owned by a named team and enforced at deploy time, not filed in a wiki.
The calendar is built from your Jira fix versions, so it reflects the plan you already have.
Cross-release conflicts in the same window are detected and a resequence is suggested.
A release aimed at a frozen window shows up as a cited reason in its Gaja verdict.
Freezes are advisory or enforced per your choice, and every exception is recorded with an owner.
How it works

What actually happens.

01

Build the calendar

Fix versions become the release calendar; you add the freezes your business needs.

02

Assign ownership

Each freeze has a named owner — finance for quarter-end, security for an incident freeze.

03

Enforce at deploy

A release aimed inside a freeze is flagged before it ships, with the freeze and its owner named.

04

Resequence conflicts

Two releases in the same window get a suggested new order at planning, not a collision at merge.

Who this is for
Release ManagerDevOps / Platform EngineerCompliance / Security
Reads from
JiraGitHubJenkinsSlack

ArcRelease reads the calendar from your tools and is never in the deploy path.

FAQ

Calendar & freeze, answered.

From your Jira fix versions, so it reflects the release plan your teams already maintain. You layer freeze windows on top of it.

If you wire the advisory check into branch protection, yes. Otherwise it warns loudly and records any exception with an owner and a reason.

Related capabilities

Gaja AI preflight
GO, NO-GO or CONDITIONAL, with its reasons attached.
Read more →
Incident correlation
From alert to the pull request that caused it, in about ten seconds.
Read more →
Release risk analytics
DORA four keys, decomposed by service and team.
Read more →

Stop guessing at go/no-go.

Tell us about your release process. Connect your stack in ten minutes, run a Gaja preflight on a real release, and see the reasons behind the verdict.

See the platform

Free plan · ten minute setup · we reply in one to two business days