Illustrative scenario

The 2am P0 that took 40 minutes to trace, and the release that should never have shipped

A modelled Series B fintech running 40 services and around 370 deploys a month, where Payments Core is the release everybody quietly dreads.

10s
to a candidate root cause, against 40 minutes hunting Slack
91%
preflight accuracy across the modelled Finotech release set
3x
fewer post-release P0/P1 incidents per release

The night it goes wrong

A P0 fires on checkout at 2am. The first forty minutes are archaeology: four teams deployed that afternoon, PagerDuty points at a symptom, Datadog at another, and nobody can say whether anything even shipped that touched payments. By the time the commit is found, the author is asleep and the context is gone.

What changes with ArcRelease reading the same release

The alert arrives already correlated to the deployments in its blast radius, ranked by overlap, and resolved to the pull request and Jira story in about ten seconds. The bridge call opens with a named candidate instead of an open question.

  • The dependency graph shows Payments Core had a hard block that was overridden without a reason.
  • The ceremony trail shows the security gate was 26 hours overdue when the release shipped.
  • Risk history shows an 18.2% change failure rate against a 7.9% org median.
  • Gaja would have returned NO-GO before the release, with all of the above cited.

The release that should never have shipped

The same signals that trace the incident in seconds also produce a preflight verdict before the release. In the modelled Finotech set, that moves post-release P0/P1 incidents from 0.42 to 0.14 per release — the 3x figure, stated as a design target, not a measurement.

Illustrative scenario

ArcRelease is pre-launch and in early access. This is a modelled scenario built to show how the product behaves, using an invented company. It is not a customer story, and the figures are design targets from product modelling, not measured production results.

Stop guessing at go/no-go.

Tell us about your release process. Connect your stack in ten minutes, run a Gaja preflight on a real release, and see the reasons behind the verdict.

See the platform

Free plan · ten minute setup · we reply in one to two business days